Plastic New Parts Painting

Solution
AudaEnterpriseGold
Updated

How to use Plastic New Parts Painting:

In AudaGraphics, the paint table now has the capability to support new part plastic painting.

When a user clicks on the New Part Paint option, a new tab will appear giving the option to select the delivery condition of the part that requires painting.
 
You can select either LE, LE2, LE3 and LE4 for a new part paint operation, eradicating the need to apply any further uplift to the calculation.

The delivery state selected will have implications on the amount of paint labour and materials generated.

The chart below highlights information on the painting procedure to help indicate which delivery condition should be chosen within Audagraphics.

AX Paint Level

AZT Paint Level

Painting Procedure


LE


K1R

No priming required, only requires colour coats/clear coats


LE2


K1N

For new plastic parts which arrive un-primed. Requires priming and then application of and colour coat/clear coats


LE3


K1G Hard/Glass Fibre

For new plastic parts which arrive un-primed where there is a need to dry flat. (E.g. hard plastic/glass fibre, followed by primer and colour coats/clear coats


LE4


K1G Soft/Polyurethane

For new plastic parts which arrive un-primed where there is need to dry flat (E.g. soft plastics/soft foam followed by primer and colour coats/clear coats with additional elastication


The Plastic-new-part-painting option allows users to accurately input the amount of paint labour and materials required by identifying the correct painting procedure for each part.

Saving you valuable time whilst creating the assessment and generating highly accurate repair estimates.
 

 

Solution
AudaEnterpriseGold

Share Article